New Price List


Recommended Feeds & Speeds & Tool Selection Guidelines
For Finishing Applications

Material
RECOMMENDED TOOL STYLE RECOMMENDED COATING BHN SFM FPT 1/4” - 3/8” DIA FPT 1/2” - 5/8” DIA FPT 3/4” - 1” DIA
ALUMINUM
SER 107
SER 109
SER 111
TiCN, ZrN, LASER (coat per order) 80 1200 to MAX .001 - .003 .003 - .006 .006 - .012
ALUMINUM - HIGH SILICONE CONTENT
SER 107
SER 109
SER 111
TiCN, ZrN, LASER (coat per order) 100 800 .001 - .003 .003 - .005 .006 - .008
CAST IRON
SER 106
SER 111
SER 112
TiCN, AlTiN 160 600 0.001 .002 - .004 .005 - .006
COPPER, BRASS
SER 107
SER 109
SER 111
TiCN, ZrN, LASER (coat per order) 100 900 .001 - .002 .003 - .004 .005 - .007
GRAPHITE
SER 107
SER 109
SER 111
AlTiN, ZrN, LASER (coat per order) 1000+ .002 - .004 .006 - .008 .010 - .012
HIGH TEMP ALLOYS - NICKEL BASE (INCOLOY, INCONEL, WASPALOY, RENE, HASTALOY)
SER 111
SER 112
AlTiN, TiCN 200 80 .0008 - .0012 .0012 - .0018 .0018 - .0025
PLASTIC AND COMPOSITES
SER 107
SER 109
SER 111
TiCN, ZrN, LASER (coat per order) 1200+ .003 - .004 .005 - .008 .010 - .014
PLASTIC WITH HIGH GLASS CONTENT
SER 109
SER 111
SER 112
AlTiN, ZrN, LASER (coat per order) 550 .003 - .004 .005 - .006 .007 - .010
STEEL 
SER 111
SER 112
TiCN, AlTiN 200 400 .001 - .0015 .0015 - .003 .003 - .004
STEEL, STAINLESS 
SER 106
SER 111
SER 112
TiCN, AlTiN 200 350 .001 - .0015 .0015 - .003 .003 - .004
STEEL, TOOL 
SER 111
SER 112
TiCN, AlTiN 200 320 .001 - .0015 .0015 - .003 .003 - .004
STEEL/HARDENED 
SER 111
SER 112
TiCN, AlTiN 52 - 60 RC 30 - 60 .0008 - .001 .001 - .002 .002 - .003
TITANIUM 
SER 111
SER 112
TiCN, AlTiN 275 400 .001 - .015 .002 - .004 .004 - .006

Finishing Application Formulas

Speeds and Feeds to be considered as a starting point. Values calculated at:
Axial Cut (depth) = Diameter x 1.5 · Radial Cut (width) = .020 to .040

Formulas:
Spindle Speed (RPM) = (3.82 x SFM) / Diameter
Feed (Inches Per Minute) = FPT (Feed per Tooth) x RPM x Number of Flutes

Example: For starting speed using a ½” 4 flute end mill cutting Stainless at a hardness of around 200 BHN, find SFM on above chart (SFM=350) and calculate RPM using formula as follows: RPM = 3.82 x 350 (SFM) / .5 (DIA) = 2674 RPM.

For starting feed: .002 (FPT) x (RPM) x 4 (Flutes) = 21 IPM .

 


Home
| Company Info | Contact Us | Products | Orders | Technical Library
Customer Support | FAQ Library | Web Site Disclaimer | Virtual Catalog

11312 Sunrise Gold Circle 
Rancho Cordova, CA 95742
Phone: (916) 638-0501 / (800) 878-0502
Fax: (916) 638-0512